Powered By Blogger

Sunday, 26 August 2012

Bathroom Refurb

 Here's a new bathroom we finished last week. The old suite and tiles were stripped out. In addition to the plumbing works there was some replastering, a new door casing, stud work, floor tiling and wall tiling.

 
We like to do everything on jobs like this to ensure continuity and perfection.
 
 
We are always happy to discuss your dream bathroom with you. We can help with the design and planning and share our inside knowledge with you of the best products.